Speaking Engagements December 1 - 3, 2026
2026 Construction Super Conference
The Hyatt Regency Huntington Beach
Huntington Beach, CA
Troutman Pepper Locke’s Albert Bates Jr. and Jamey Collidge will be speaking on two panels at the 2026 Construction Super Conference. The conference will take place from Tuesday, December 1 to Thursday, December 3 in Huntington Beach, California.
Albert Bates Jr. will present “Inside the AAA Construction Mega Project Panel: Elite Arbitrators for the Industry’s Most Complex Disputes” alongside John Carpenter of Shimmick Construction, L. Tyrone Holt of The Holt Group LLC, Tamara Linday of MasTec, and Michael Powell of the American Arbitration Association. This panel will take place on Tuesday, December 1 from 4:15–5:30 p.m. PT.
This session provides an inside look on how CMPP arbitrators are selected and what makes them sought after: expertise in CPM scheduling, delay and disruption analysis, damages modeling, and managing expert-driven records. The discussion will focus on how CMPP arbitrators handle critical issues such as multi-party case management, phased proceedings, early issue resolution, and complex evidentiary processes. Common dispute types, including delay, cost overruns, defects, and risk allocation will be explored alongside strategies for both arbitration and mediation, including timing, hybrid approaches, and settlement dynamics.
Jamey Collidge will be joined by Andrew Drobnis of Ankura Consulting Group, Ethan Teiger of Consigli Construction Co., Inc. and Chris Toomey of the University of Southern California to present “Performance on Trial: The Construction Manager’s Standard of Care Examined from All Angles.” This panel will take place on Wednesday, December 2, from 4:15–5:30 p.m. PT.
This session will examine how professional “standard of care” obligations, once limited to architects and engineers, are increasingly being applied to Construction Managers and General Contractors. It will explore the impact of these evolving contractual provisions on project contracting and delivery, performance evaluation, and the resolution of claims and disputes before, during, and after project execution.
Insight Industries + Practices