Articles + Publications November 20, 2026

Rooftop Rules: The Residential Solar Law Review – November 2026

As the residential solar industry continues to evolve, staying ahead of legislative and regulatory changes has never been more important. We’re pleased to continue Rooftop Rules: The Residential Solar Law Review, a resource designed to keep you informed of the latest state and federal developments that may impact your existing residential solar agreements and business operations. Read the August 2026 issue for updates on Arizona and Connecticut.


In This Issue:


Massachusetts

225 CMR 28.00, effective June 26, 2026, establishes the Solar Massachusetts Renewable Target 3.0 Program (SMART 3.0) as a successor to the SMART 2.0 Program, which was first enacted in July 2020, to further encourage residential, commercial, governmental, and industrial electricity customers to continue to use and develop solar tariff generating units (System or Systems). This regulation outlines the required disclosures and provisions that must be included in third-party ownership (TPO) leases and power purchase agreements (PPAs), community shared solar contracts, and direct ownership contracts, in order to provide greater consumer protections.

For TPO contracts, SMART 3.0 requires a customer signature (wet or electronic), pricing terms and contract duration, an explanation of term renewal and early termination fees, terms for removal of the System if the contract is terminated, an explanation of the purchase option (including economic terms), the rights and obligations of the owner, and the risk of loss due to System damage.

For community shared solar contracts, SMART 3.0 requires a customer signature (wet or electronic), pricing terms, term length, provisions for System removal upon termination, and explanations of renewal options, termination fees, customer purchase options (including economic terms), procedures for the sale or transfer of the customer’s house, and the risk of loss from System damage.

For low-income properties, there are additional requirements. As part of the application process, TPOs also require at least a 20-year term length (or demonstrated intent to renew such TPO) in order for the property to receive the generation output, and for TPOs where the prime contractor is not the System owner, there must be executed contracts between the System owner and the contractor and between the System owner and the customer.

Finally, for sale agreements (residential direct ownership contracts), SMART 3.0 requires a customer/buyer signature (wet or electronic), a right of rescission of at least three business days (consistent with federal law), the System’s annual degradation and estimated first-year production, the allocation of maintenance obligations between customer and installer, and customer’s rights and remedies for maintenance/service for seller/installer bankruptcy.

For smaller Systems (under 25kW), the Massachusetts Department of Energy Resources has prepared a disclosure form (found at this link) that must be provided to the customer before execution of the contract (whether TPO or sale). The required disclosures include contract pricing, complete system cost information, O&M responsibilities, disposition of renewable energy certificates (RECs) and tariff terms, and anticipated production. This form is unchanged from the SMART 2.0 Program.


Virginia

Since the Virginia Clean Economy Act was signed into law in 2020, Virginia has enacted several laws and launched initiatives affecting solar development (including balcony solar, farmland solar, and Switch Together). Among those new measures are Virginia Code Section 54.1-1117.1 and Virginia Code Section 50-22-265, which take effect January 1, 2027, and outline provisions and written disclosures that are required to be included in various residential solar sale, lease, and power purchase agreements.

The laws define a “solar installation company” to include companies that contract to install solar systems for residential customers or third parties, but notably they do not include “third-party owners” (TPOs). As discussed below, this definition creates ambiguity for the obligations of TPOs since several requirements apply only to solar installation companies. Given the language of these statutes, we encourage TPOs to reach out with any questions about required disclosures.

The new laws include requirements for all residential solar contracts as well as individual requirements for sales, leases, and PPAs.

In-Contract Requirements

All residential solar contracts must include the following, in 10-point font:

  • The name, address, telephone number, email address, and state contractor license number of the solar installation company and, if applicable, the “third party providing the lease.”

    We note that this is taken directly from the law, and it is unclear whether this requirement also applies to third-party owners providing PPAs.
  • If the solar installation company will be using subcontractors, the name, address, telephone number, email address, and state contractor license number must be included at the time of executing the written contract (if known), and within five business days of contracting with any subcontractor if not known at the time of execution.

    We note that this is taken directly from the law, and it is unclear whether this requirement also applies to third-party owners providing PPAs.
  • The amounts and schedule for progress payments, including down payment amount, payment due dates, how invoices will be sent, and how payments will be made. Notably, third-party owners cannot require payment from a customer until the solar energy system has been installed, achieved permission to operate (PTO) and interconnection, and “is functioning.” This appears to restrict any down payment under a TPO contract but applies only to third-party owners and not installers or sellers.

    We note that these requirements are in addition to any other federal disclosure laws.
  • Solar energy system design assumptions, including system size, estimated first-year production, estimated annual system production degradation, and energy storage information (presence, capacity, maximum power output, and model information).

    We note that if equipment substitutions differ from the contracted system design, the solar installation company must notify the customer within five business days.
  • All one-time or recurring fees, including late fees and their triggers, system removal fees, UCC fees (removal and refiling), internet connection fees, and ACH fees. Solar installation companies obtaining, arranging, or negotiating credit for the consumer must disclose all loan fees, dealer fees, program fees, or buyer or seller points.

    We note that these requirements are in addition to any other Virginia or federal disclosure laws.
  • A description of all performance or production guarantees or estimates of performance or production.
  • The right to cancel the contract, without penalty, within five business days of contract execution.

    We note that this requirement deviates from the standard three-business-day cooling-off period under federal law.

In addition to the requirements outlined above, there are further in-contract requirements depending on the type of agreement being entered into.

Sale of a Solar Energy System

Sales of a solar energy system must list the total cost of the system (including the costs of all equipment, any energy storage system, and other charges), as well as reasonable estimates of labor and installation costs. Any adjustment to the total cost of the system after execution will require a written change order signed by both parties before additional or modified work is performed.

Lease of a Solar Energy System

Leases must include the term and amount of monthly payments under the lease (including the date of the first increase and any other payment increases), as well as the total number of payments and estimated payments over the term of the lease.

Power Purchase Agreement

PPAs must include the term and amount of monthly payments under the PPA, including any payment increases and the date of the first increase, rates applicable for the first year under the PPA, and the total number of payments and estimated payments over the term of the PPA.

Standalone Disclosure Requirements

In addition to the above in-contract requirements, the following disclosures must be provided to the customer in 10-point font either (i) in a separate document, signed by the customer or purchaser prior to the execution of the written contract, or (ii) via disclosures that are included as a cover sheet to the written contract [1]:

  • Whether and to what extent maintenance and repairs are included, and maintenance costs that the customer will be responsible for.
  • The following statement: “Comparable equipment may be installed. Such comparable equipment shall be substantially similar equipment to the proposed solar energy system and will not result in a reduction of the estimated first year production by more than five percent, a decrease in the solar energy system’s kilowatts-AC and kilowatts-DC size, or an increase in the purchase price for the solar energy system.”
  • A description of the workmanship warranty that covers repairs for any damage to the customer’s residential property related to the installation of the solar energy system.
  • For a lease, whether the solar energy system removal cost is included in the contract.

    We note that this is taken directly from the law, and it is unclear whether this also applies to third-party owners providing PPAs.
  • A brief description of the basis for any savings estimates that were provided to the customer or purchaser, with a copy of such savings estimates, which must include the applicable electric utility rates for service, assumptions for increases to future rates for electric service, estimated solar energy system production, and the availability of programs that provide utility compensation for excess energy generated by the solar energy system at the time the contract is executed.
  • Renewable energy credit (REC) information, including retention and ownership information.
  • Which party to the agreement is responsible for obtaining interconnection approval.
  • A right-to-cancel notice within five business days of contract execution, including the date and time the right expires and the method for cancellation.
  • The following statement: “The assumptions used to estimate savings such as utility rates may change. There may be fees and standby and demand charges that cannot be offset with solar energy, and excess electricity sent back to the grid may be credited at rates below what you pay for electricity. For further information regarding rates, you may contact your local utility or the State Corporation Commission. Tax and other state and federal incentives are subject to change or termination by executive, legislative, or regulatory action, which may impact savings estimates. Please read your contract carefully for more details.”
  • If applicable, whether the owner or lessor of the solar energy system will be submitting a financing statement for the system. Note, if a financing statement is submitted, the following statement shall also be included: “A solar loan, lease, or power purchase agreement may affect your ability to sell your home. A buyer may not be willing to assume such obligations, which may affect a home sale.”
  • If applicable, information regarding transferability of the lease and any conditions for lease transfers in connection with a customer selling their home.

    We note that this is taken directly from the law, and it is unclear whether this also applies to third-party owners providing PPAs.

[1] If a contract is between a solar installation company and a consumer/purchaser, the solar installation company is required to provide such disclosures via the disclosure form provided by the Virginia Board for Contractors (Solar Energy Disclosure Form), which must be signed by both the solar installation company and the consumer/purchaser.


Rooftop Rules: The Residential Solar Law Review is your resource for residential solar legislative and regulatory updates. As the residential solar landscape continues to evolve, staying ahead of policy changes is critical to keeping your agreements and operations compliant. Our team will monitor newly enacted legislation, regulatory guidance, and policy changes across key states and jurisdictions affecting the residential solar market.

For questions about these developments, contact Andrew Thurmond or Chris J. Link, attorneys on Troutman Pepper Locke’s Energy + Infrastructure team.