In the next episode of our Building the Grid series, Troutman Pepper Locke Partners Josh Combs and Andy Flavin unpack the concept of “speed to power” — how quickly large load electric customers like data centers secure reliable power when and where they need it — and how that imperative is colliding with the realities of state and local transmission planning. Zooming in on Virginia and the PJM region, where large load demand is outpacing the traditional planning cycle, Josh and Andy explain the intersection between PJM transmission planning and Virginia’s own state-level siting process, including the certificate of public convenience and necessity (CPCN) and an appeal right to the Virginia Supreme Court that can extend project timelines by a year or more. They close with a clear message: plan early, build public trust before filing, and prioritize existing transmission rights-of-way wherever possible.

Click below to view more episodes of Building the Grid:
Aligning Utilities and Developers on the Next Wave of Transmission

The commentary and views expressed in this video by Troutman Pepper Locke attorneys and/or guests do not necessarily represent the views of Troutman Pepper Locke or the firm’s clients.